Aston Hall Cross Shaped Rills Feeding a Main Pool
|
|
This very large rill feature was sealed with a two layer grp system. The two layer option was chosen for this project as a more coarse finish was required than our three layer system would have given. This option was chosen so as to allow the fixing of stone sets on to it and thus achieve the desired finish to the project. This GRP installation was just part of the total restoration of Aston Hall by Laing O'rouke.
|
||||||||||||







